Перейти к содержимому

PVC window installation

Professional installation to construction standards with a workmanship warranty.

What’s included

Dismantling

Removal of old frames with a turnkey order

Installation

Installation to construction standards

Debris removal

Bulky construction waste taken to the designated area

Prices and cost factors

Opening complexity

Geometry and wall material

Floor level

Lifting logistics

Extra work

Slopes, sills, and drip edges

Official warranty

We are confident in our product quality and take full responsibility for the result. All warranty obligations are officially stated in the contract.

After-sales service

Even after the warranty expires, we are here for you: diagnostics, hardware adjustment, and seal replacement.

Maintenance guide
10 years

Profile

  • UV resistance of the profile
  • Preservation of structural geometry
5 years

Glass unit

  • Chamber airtightness and no internal condensation
  • Structural integrity of the glass unit
2 years

Hardware

  • Stable performance of moving parts
  • Proper hardware operation
2 years

Installation

  • Reliable anchoring in the opening
  • Quality of installation joints

We create
high-tech
solutions

QualitetLine is not just a factory of PVC and aluminum structures. We manufacture windows, doors, portal systems, and facade glazing, making your home warmer, quieter, and safer using Alutech, Kömmerling, TOPLINE, and SALAMANDER profiles.

  • 18+ Years on the market
  • 13K Completed projects

In-house line

Automated assembly ensures ideal geometry and structural reliability.

Quality inspection

Multi-stage inspection of structures before dispatch and professional installation backed by contract warranty.

Our main goal is to manufacture a product that will serve reliably for decades without a single issue.

— Head of production
Technical insights from our experts

Frequently asked
Questions

View all
Lead time depends on the insulating glass unit, sizes, colour and material.

Approximate timing:
• White PVC — up to 7 business days.
• Laminated PVC — up to 10 business days.
• Aluminium — up to 50 business days.

Ask a manager for a more precise schedule.
There is no universally best material. PVC is usually practical for standard windows, while aluminium is stronger for large sizes, panoramic glazing, heavy sashes and complex architecture. For living spaces choose a thermally broken aluminium system.
There is no single maximum size. It depends on the profile system, glass unit size and weight, wind load, opening type and operating conditions. Large structures are calculated individually.
It depends on the task. A swing door is usually simpler and more airtight, while a sliding system covers much larger openings and saves space in front of the door. For panoramic terrace exits a lift-and-slide system is often best.
Installation tapes protect the joint from outdoor moisture and indoor vapour. They help keep the thermal performance of the joint and extend its service life.

Quick start

Get an accurate
calculation online

Leave your contact details. Our manager will call you back to discuss your project and offer glazing options.

We will contact you shortly
Transparent estimate with no hidden fees